Step 1 of 4 · Capture
Locate the fault.
A site employee reports poor cooling on Level 03. Selecting North Tower and HVAC-218 ties the request to a specific place and asset.
- Owner
- Site employee
- Record
- Work request
Use case · Breakdown response
A cooling unit stops working on Level 03. See how a facilities team tracks the response from the first report to the final job card.
Explore the responseNorth Tower · Level 03
Breakdown walkthrough
Step 1 of 4 · Capture
A site employee reports poor cooling on Level 03. Selecting North Tower and HVAC-218 ties the request to a specific place and asset.
Step 2 of 4 · Assign
The facilities manager reviews the request, sets a high priority and assigns the inspection. The work order carries the asset and location forward.
Step 3 of 4 · Repair
The technician follows the saved inspection procedure, records the filter used and logs the time spent on the unit.
Step 4 of 4 · Close
The team reviews the completed work and retains the findings against HVAC-218. The next technician can see which part was replaced.
Explore the steps your team takes from request to repair.