Maintenance plans
Schedule service by time or equipment use.
Tie an asset to a saved job template and generate preventive work when a date or usage interval comes due.
Generator service interval
- Asset
- Standby generator GEN-04
- Trigger
- Every 250 running hours
- Instructions
- Generator inspection · v2
The workflow
From service interval to scheduled job
A standby generator needs service according to run time, even when it operates infrequently.
- Choose the asset and instructions
Pin a version of the service template so each generated order carries the intended procedure.
- Set the trigger
Use a time interval in days or a usage interval on a cumulative meter.
- Review generated work
Open the generation history to see the due interval and the linked preventive work order.
Maintenance plans
Common questions
Can I pause a plan?
Pausing stops future generation. Jobs already created remain in the work-order list.
Does a template edit change existing instructions?
The plan uses its selected version. Choose a newer version when the service instructions change.
How does usage differ from a condition?
Usage tracks cumulative intervals. A condition rule monitors a gauge against defined limits.
Walk through your workflow.
Explore the steps your team takes from request to repair.