Mining guide
Mining maintenance, aligning mobile service and plant shutdown preparation
Organise mining maintenance in Wular Works with run-hour service plans, crusher-area work orders, wear-part reservations and shift evidence.
How can Mining teams use Wular Works?
Mining maintenance teams can use Wular Works to identify pit and plant equipment, schedule usage-based service and prepare wear parts for planned work. Keep each job linked to its equipment and location, then record the actual repair and findings for the next shift. Start with one equipment group and a clearly defined shutdown window.
Distinguish mobile equipment from fixed-plant locations
A haul truck and a crusher feeder have different operating patterns but both need a reliable maintenance identity. Give each mobile unit a distinct asset code. Build fixed-plant locations around the actual processing areas so a feeder inspection can be identified by plant, crusher section and equipment.
Use equipment categories to help the workshop find similar units, while keeping the service history individual. Attach the correct manual and manufacturer details. Verify the initial list with maintenance and operations personnel before connecting work requests and recurring service plans to those assets.
Prepare mobile service from recorded operating hours
Log a truck’s cumulative operating hours at the agreed shift observation point. A maintenance plan can use the configured interval to generate a service job with the selected template. Review the meter history to check which observations led to the due work.
Keep the planning window coordinated with the people scheduling the equipment. A generated job identifies due maintenance within the software workflow. The workshop still needs to confirm availability, required resources and the operational handoff before the machine enters the service area.
Stage fixed-plant wear parts before the shutdown
For an apron-feeder inspection, review the expected rollers, bearings and other parts on the work order. Stores checks available quantities and existing reservations before setting aside parts for the planned stop. If a purchase is outstanding, the receiving record should show what actually arrived.
Use the maintenance calendar to review work scheduled around the agreed crusher-area outage. Record each job against its own equipment so findings can be traced after the shutdown. Sequencing and isolation remain part of the site’s shutdown planning process and its responsible personnel.
Use shift findings to improve the next work package
The completed order should show the work carried out, the parts used, recorded labour and the inspection evidence requested by the procedure. Identify where a defect was found so the next planner can understand a repeat complaint on that unit.
Begin with one mobile fleet group or plant section. Review jobs waiting for parts, missing observations and completed orders with unclear findings. Use those records to refine templates and stock preparation. Establish actual baselines for planning decisions instead of relying on assumed savings from introducing software.
Three workflows to put into practice
Connect the guide to the modules your team will use on the job.
Plan mobile equipment service
Log haul-truck hours at shift change. The workshop uses the cumulative meter interval to generate the next service work order.
Explore maintenance plansStage wear parts for shutdown
The stores team checks bearings and rollers against the feeder job and reserves what is available before the planned plant stop.
Explore parts inventoryCoordinate the shutdown window
The planner checks the crusher-area work orders together in the calendar and schedules them around the same planned outage.
Explore maintenance calendarCommon questions
Can mobile equipment and fixed plant use the same workspace?
Both can have individual asset records and linked work orders. Use categories and locations to distinguish their operational context.
How can wear parts be reserved for a shutdown?
Review available stock and reserve the required quantity against the relevant job. Check outstanding purchase receipts before depending on those parts.
What should the next shift see after an inspection?
The equipment identity, completed checks, findings, parts used and any follow-up action retained on the work order.