Building Materials guide
Building materials maintenance, planning mixers, conveyors and wear parts
Use Wular Works to organise building materials equipment, plan usage-based service and prepare wear parts before a plant maintenance window.
How can Building Materials teams use Wular Works?
Building materials teams can use Wular Works to connect mixers, conveyors and dust collectors with service plans, repair jobs and wear-part reservations. Organise the plant by process area, record operating hours where appropriate, and review parts availability before a planned stop. The completed work order becomes the reference for the next inspection.
Describe the plant in the same terms as the crew
A batching site can contain several conveyors with similar descriptions. Name the location hierarchy around the actual process, such as aggregate receiving, transfer and mixing. Give each feeder, mixer and collector a unique asset code. Capture its manufacturer and reference documents so the crew can distinguish the component that needs attention without relying on a photograph alone.
Use equipment categories to group similar assets across the plant. A planner preparing a conveyor round can then find the relevant units while preserving each unit’s individual work history. Verify the location and code on a sample of equipment with the field team before assigning recurring inspections.
Use recorded duty to prepare service work
A mixer may work extended shifts during a large supply order and spend less time running the following week. Where run hours are available, record them as a cumulative meter on that asset. A maintenance plan can use that interval to generate preventive work with a selected instruction-template version.
Review the meter history when a service job becomes due. The reading provides context for the work. It also helps the planner find missing observations before relying on the schedule. Keep calendar-based inspection work alongside usage-based service when the site requires both types of maintenance.
Reserve the wear parts before committing the crew
An operator reports an uneven roller on the aggregate transfer belt. Dispatch creates the job against that conveyor and the planner reviews the expected roller and bearing requirements. Stores checks the available quantity, taking existing reservations into account, then reserves the parts against the order.
When a part must be bought, use its supplier ordering reference and the intended receiving location on the purchase order. Record a partial receipt as the quantity that actually arrived. This lets the planner review what is still outstanding before confirming the maintenance window with production.
Retain findings that explain the next repair
At completion, record which roller was replaced, what the crew observed and which parts were issued. Attach photographs to the relevant job or procedure answer. A later planner reviewing repeated belt problems can open the same asset’s earlier work instead of searching through unrelated plant reports.
Begin the rollout with one transfer section or mixing area. Check the proportion of completed orders with useful findings, review jobs waiting for parts and reconcile selected stock balances. Use those records to decide which instructions need revision and which equipment should join the next planned service round.
Three workflows to put into practice
Connect the guide to the modules your team will use on the job.
Service by operating hours
A mixer works longer shifts during large orders. Log its run hours so preventive jobs follow actual use across busy and quiet weeks.
Explore maintenance plansSet aside wear parts
Before the transfer belt inspection, stores checks the roller and bearing balances and reserves the parts against the work order.
Explore parts inventoryTrace repeat faults
After a second dust collector callout, the planner opens that unit’s asset record to review earlier repairs and locate its manual.
Explore assetsCommon questions
How can the team distinguish similar conveyors?
Use a unique asset code and an explicit process location for each conveyor. Keep repair history and documents against that individual asset.
Can parts be set aside for a planned stop?
Yes. Review the available stock and reserve the required quantity against the work order. Record the parts actually used during execution.
What if only part of a spare-parts delivery arrives?
Receive the delivered quantity on the issued purchase order and review its outstanding balance before scheduling dependent work.